
Astana Airport Renovation Project & Aircraft Fuel Filling System
12 Haziran 2026
İzmir Navy Shipyard East Berth Rehabilitation and Dock Construction
12 Haziran 2026Potiport Petroleum Storage Terminal PH.1B
Sistemler ve Çalışma Kapsamı
- Production of petroleum storage tanks, erection, sand blasting, painting, (35,000 m3). Installation of pumping station, process piping, fire suppression system, railway unloading and ship filling units.

