
TCO Headquarters Building
Haziran 11, 2026
Dengemek Shopping Center
Haziran 11, 2026Baku International Airport Terminal and ATC Building
Sistemler ve Çalışma Kapsamı
- Mechanical works including engineering, shop drawings, as-built drawings, HVAC (Heating, Ventilation, and Cooling), plumbing, fire suppression, building automation, start up, commissioning, and engineering lines works.

