
Baku International Airport Terminal and ATC Building
Haziran 11, 2026
BSL3 and BSL2 Containment Laboratory Project
Haziran 11, 2026Dengemek Shopping Center
Sistemler ve Çalışma Kapsamı
- Mechanical works including HVAC (Heating, Ventilation, and Cooling), plumbing, fire suppression, building automation, and engineering lines works.

